Gallery

Our Work In Action

Explore our applications, site activities and completed works across waterproofing, injection, concrete repair, epoxy, HVAC, painting and building works.

Waterproofing membrane installation
View Waterproofing membrane installation
Torch-applied membrane to roof deck
View Torch-applied membrane to roof deck
Rolling out waterproof membrane
View Rolling out waterproof membrane
Membrane laying across flat roof
View Membrane laying across flat roof
Liquid coating application
View Liquid coating application
Detailing at roof upstand
View Detailing at roof upstand
Crack mapping before injection
View Crack mapping before injection
Structural crack in retaining wall
View Structural crack in retaining wall
Surface preparation for sealing
View Surface preparation for sealing
Basement leakage treatment zone
View Basement leakage treatment zone
Concrete defect assessment
View Concrete defect assessment
Reinforcement fixing on site
View Reinforcement fixing on site
Rebar preparation for reinstatement
View Rebar preparation for reinstatement
Foundation works in progress
View Foundation works in progress
Column and substructure works
View Column and substructure works
Completed epoxy floor finish
View Completed epoxy floor finish
Floor coating application
View Floor coating application
Warehouse floor preparation
View Warehouse floor preparation
Car park deck coating
View Car park deck coating
Exposed ductwork installation
View Exposed ductwork installation
Ventilation system detailing
View Ventilation system detailing
Industrial ducting installation
View Industrial ducting installation
Rooftop ventilation plant
View Rooftop ventilation plant
Rooftop AC equipment
View Rooftop AC equipment
Interior wall painting
View Interior wall painting
Roller application to wall
View Roller application to wall
Wall finishing works
View Wall finishing works
Interior redecoration
View Interior redecoration
Site coordination meeting
View Site coordination meeting
Level check during execution
View Level check during execution
Active construction site
View Active construction site
Structural works in progress
View Structural works in progress

Customer-submitted AI inspection photos remain private and never appear in this gallery.

Before & After

Results You Can See

Drag the handle across each image to compare the recorded condition before treatment with the completed works.

All Comparisons
After: Podium Deck Membrane Replacement After
Before: Podium Deck Membrane Replacement Before

Business Bay, Dubai

Podium Deck Membrane Replacement

Problem
Failed membrane with water tracking to the parking level below.
Treatment
Full membrane removal, substrate repair and a new torch-applied bituminous system.
After: Basement Wall Leakage Treatment After
Before: Basement Wall Leakage Treatment Before

Al Quoz, Dubai

Basement Wall Leakage Treatment

Problem
Active ingress through construction joints and tie-rod holes.
Treatment
PU foam injection to arrest flow, followed by acrylic gel curtain injection.
After: Car Park Floor Refurbishment After
Before: Car Park Floor Refurbishment Before

Deira, Dubai

Car Park Floor Refurbishment

Problem
Dusting slab, oil staining and worn bay marking throughout.
Treatment
Mechanical preparation, epoxy coating system and full re-marking.
WhatsApp Call Us