Comparisons
Every Project, Recorded Both Ways
Each entry shows the project, the problem identified on site, the treatment applied and the location.
After
Before
Podium Deck Membrane Replacement
Business Bay, Dubai
- Problem
- Failed membrane with water tracking to the parking level below.
- Treatment
- Full membrane removal, substrate repair and a new torch-applied bituminous system.
After
Before
Basement Wall Leakage Treatment
Al Quoz, Dubai
- Problem
- Active ingress through construction joints and tie-rod holes.
- Treatment
- PU foam injection to arrest flow, followed by acrylic gel curtain injection.
After
Before
Car Park Floor Refurbishment
Deira, Dubai
- Problem
- Dusting slab, oil staining and worn bay marking throughout.
- Treatment
- Mechanical preparation, epoxy coating system and full re-marking.
After
Before
Spalled Soffit Concrete Repair
Jumeirah, Dubai
- Problem
- Delaminated cover concrete with exposed, corroding reinforcement.
- Treatment
- Break-out, rebar treatment, mortar reinstatement and anti-carbonation coating.
Customer-submitted AI inspection photos remain private and never appear here.
Our Process
How A Result Like This Happens
01
Enquiry
Tell us about your requirement.
02
Site Assessment
Our team evaluates the site condition.
03
Technical Solution
An appropriate scope and treatment are developed.
04
Quotation
The proposed work and commercial offer are submitted.
05
Execution
Approved works are carried out professionally.
06
Quality Inspection
Completed work is reviewed.
07
Handover
Project is completed and handed over.