Waterproofing
Business Bay, Dubai Commercial Tower
Podium Deck Waterproofing Rehabilitation
- Initial Condition
- Water staining reported in the parking level directly below the landscaped podium deck, with efflorescence visible at slab soffits.
- Scope of Work
- Removal of existing failed membrane, substrate repair, re-application of a torch-applied bituminous system with protection board and drainage layer.
- HAVEN FORCE Solution
- A two-layer modified bitumen system was specified after assessing the substrate and falls. Upstands were terminated into a chased reglet and all penetrations were individually detailed.
Materials / SystemSBS-modified bituminous membrane, protection board, drainage composite