Substructure Waterproofing by HAVEN FORCE Technical Services in Dubai
Waterproofing Solutions

Substructure Waterproofing

Stronger Foundations, Lasting Structures

We deliver advanced substructure waterproofing to protect basements, raft foundations, retaining walls and below-ground structures from water ingress. Our systems are designed to withstand high hydrostatic pressure and ensure long-term durability, keeping your structure safe and dry.

Water Tight
Protection

Resistant to
Hydrostatic Pressure

High Durability
Systems

Long-Term
Solution

Common Problems

What We Typically Find

The conditions most often reported before a substructure waterproofing scope is developed.

01

Water pressure against buried walls

Permanent hydrostatic head finding any weakness in the tanking.

02

Construction joints left unsealed

Cold joints between pours forming a direct route for groundwater.

03

Membrane damage during backfill

Sheet systems punctured by fill material before the protection layer went on.

04

Rising damp through the raft

Moisture migrating up through the slab into finishes and walls.

Scope & Application

What This Service Covers

Service Scope

  • Site survey and technical assessment
  • Surface preparation and priming
  • Bituminous / PVC / HDPE / TPO systems
  • Waterproofing for raft foundations
  • Waterproofing for basements and retaining walls
  • Detailing at construction joints and pipe penetrations
  • Protection boards and drainage layer installation
  • Quality inspection and testing

Suitable For

  • Basements
  • Raft Foundations
  • Retaining Walls
  • Podiums & Underground Car Parks
  • Commercial Buildings
  • Residential Developments
  • Infrastructure Projects

Key Benefits

  • Prevents water ingress
  • Withstands high water pressure
  • Enhances structural durability
  • Reduces maintenance costs
  • Extends service life
  • Suitable for demanding conditions
  • Peace of mind for your investment
  • Engineered to the ground conditions
Our Process

Work Methodology

Five controlled stages from first inspection to final quality check.

Site Assessment — Substructure Waterproofing
1

Site Assessment

Detailed inspection to understand site conditions and requirements.

Surface Preparation — Substructure Waterproofing
2

Surface Preparation

Cleaning and priming for optimal adhesion.

Membrane Installation — Substructure Waterproofing
3

Membrane Installation

Application of the selected waterproofing system as per specification.

Protection & Drainage — Substructure Waterproofing
4

Protection & Drainage

Installation of protection boards and drainage layer where required.

Final Inspection — Substructure Waterproofing
5

Final Inspection

Quality check to ensure complete and reliable waterproofing.

Materials & Systems

Specified To The Condition

Systems are selected according to substrate, exposure and project specification. The final specification is confirmed after a site assessment.

HDPE & PVC Sheet Membranes

Pre-applied and post-applied sheets for raft and wall tanking.

Bituminous Membranes

Torch-applied modified bitumen for below-ground horizontal and vertical faces.

Protection Board & Drainage Composite

Physical protection during backfill plus a drained cavity to relieve pressure.

Waterstops

Hydrophilic and PVC profiles cast into construction joints.

Gallery

Work In Progress

Substructure Waterproofing — site photograph
View
Substructure Waterproofing — site photograph
View
Substructure Waterproofing — site photograph
View
Substructure Waterproofing — site photograph
View
Full Gallery
FAQs

Questions About Substructure Waterproofing

Only where the face is accessible. On existing buildings we usually work internally, using injection and cementitious tanking instead.
Pre-applied membranes are laid before the concrete is poured and bond to it. Post-applied go on after the structure is built, where the face is accessible.
Yes, when specified for it. The system is selected against the expected hydrostatic head identified during assessment.
WhatsApp Call Us