Construction Joint Injection by HAVEN FORCE Technical Services in Dubai
Leakage & Injection

Construction Joint Injection

Sealing the Cold Joint

Construction joints are where one pour meets the next, and unless a waterstop was cast in correctly they leak. HAVEN FORCE injects these joints to form a continuous seal along the full line of the joint.

Full Joint
Continuity

Stops
Joint Leakage

Pressure
Resistant

Internal
Access Only

Common Problems

What We Typically Find

The conditions most often reported before a construction joint injection scope is developed.

01

Water tracking along a horizontal line

The classic signature of a leaking construction joint.

02

Waterstop missing or displaced

The cast-in stop omitted, or moved during the pour.

03

Laitance left on the joint face

Weak surface layer preventing the next pour from bonding.

04

Honeycombing at the joint

Poor compaction at the junction leaving voids for water.

Scope & Application

What This Service Covers

Service Scope

  • Joint tracing and marking
  • Drilling to intersect the joint plane
  • Packer installation along the joint line
  • Sequential PU or acrylic injection
  • Verification injection at intervals
  • Packer removal and making-good
  • Surface sealing over the joint
  • Testing and documentation

Suitable For

  • Basements
  • Retaining Walls
  • Construction Joints
  • Lift Pits
  • Water Tanks & Reservoirs
  • Swimming Pools
  • Podiums & Underground
  • Tunnels & Utility Ducts

Key Benefits

  • Seals the full joint line
  • Stops leakage under pressure
  • No excavation needed
  • Long-lasting continuous seal
  • Protects reinforcement at the joint
  • Cost-effective remedial method
  • Suitable for live structures
  • Verifiable along the joint
Our Process

Work Methodology

Five controlled stages from first inspection to final quality check.

Inspection — Construction Joint Injection
1

Inspection

Trace the joint line and identify where water is entering.

Drilling — Construction Joint Injection
2

Drilling

Drill at an angle so each hole intersects the joint plane.

Injection — Construction Joint Injection
3

Injection

Inject sequentially along the joint until resin carries between holes.

Sealing — Construction Joint Injection
4

Sealing

Remove packers, fill holes and seal the joint surface.

Verification — Construction Joint Injection
5

Verification

Re-inspect after curing and inject any remaining active points.

Materials & Systems

Specified To The Condition

Systems are selected according to substrate, exposure and project specification. The final specification is confirmed after a site assessment.

Hydrophobic PU Resin

Stops active flow and resists re-wetting at the joint.

Hydrophilic Waterstop Paste

Surface-applied at the joint where access allows.

Non-Shrink Mortar

Fills drill holes flush without cracking away later.

Gallery

Work In Progress

Construction Joint Injection — site photograph
View
Construction Joint Injection — site photograph
View
Construction Joint Injection — site photograph
View
Construction Joint Injection — site photograph
View
Full Gallery
FAQs

Questions About Construction Joint Injection

They are a planned discontinuity. Unless a waterstop was installed and the joint face prepared properly, water follows the line.
Yes. Injection works sequentially along the joint so resin carries from one hole to the next, forming continuity.
Yes. It is the standard remedial approach where the joint was never treated during construction.