Lift Pit Leakage Treatment
Dry Pits, Safe Equipment
Lift pits sit at the lowest point of a building and collect any water that gets in, putting equipment and safety at risk. HAVEN FORCE treats pit leakage with injection followed by internal tanking, working around lift availability.
Lowest
Point Protection
Stops
Standing Water
Equipment
Safety
Full
Tanking
What We Typically Find
The conditions most often reported before a lift pit leakage treatment scope is developed.
Standing water in the pit
Ingress exceeding what the sump pump can clear.
Corroding buffers and rails
Permanent damp attacking lift equipment and fixings.
Leakage at the pit base joint
The wall-to-slab junction acting as the entry point.
Failed previous coating
Surface treatment applied over active leakage, which then debonded.
What This Service Covers
Service Scope
- Coordination with the lift contractor
- Dewatering and cleaning
- Leak path identification
- PU injection at joints and cracks
- Crystalline cementitious tanking
- Coving at the base junction
- Sump and pipe entry detailing
- Inspection and return to service
Suitable For
- Basements
- Retaining Walls
- Construction Joints
- Lift Pits
- Water Tanks & Reservoirs
- Swimming Pools
- Podiums & Underground
- Tunnels & Utility Ducts
Key Benefits
- Eliminates standing water
- Protects lift equipment and safety
- Full internal tanking
- Coordinated around lift availability
- Long-term protection
- Reduces pump wear and callouts
- Supports lift inspection compliance
- Verified before handover
Work Methodology
Five controlled stages from first inspection to final quality check.
1
Inspection
Dewater, clean and identify exactly where water enters.
2
Preparation
Prepare surfaces and open up cracks and joints.
3
Injection
Inject PU at the base joint, cracks and penetrations to stop flow.
4
Tanking
Apply crystalline cementitious tanking with coving at the junction.
5
Final Inspection
Confirm the pit is dry and hand back to the lift contractor.
Specified To The Condition
Systems are selected according to substrate, exposure and project specification. The final specification is confirmed after a site assessment.
PU Injection Resin
Stops active ingress at the base joint before tanking.
Crystalline Cementitious Tanking
Negative-side system suited to a permanently wet environment.
Coving Mortar
Forms a radiused fillet so the tanking runs continuously up the wall.
Questions About Lift Pit Leakage Treatment
Related Leakage & Injection Services
Leakage Repair
Stop Leakage. Restore Strength. Protect for the Future.
ViewSeepage Repair
Stop Seepage. Protect Your Space.
ViewPU Injection
Arresting Active Water, Fast
ViewEpoxy Injection
Structural Bonding for Dry Cracks
ViewAcrylic Gel Injection
Curtain Sealing Behind the Structure
ViewConstruction Joint Injection
Sealing the Cold Joint
View