Kicker Joint Injection by HAVEN FORCE Technical Services in Dubai
Leakage & Injection

Kicker Joint Injection

The Wall-to-Slab Junction

The kicker is the short concrete upstand at the base of a wall, and the joint between it and the slab is one of the most common leak paths in any basement. HAVEN FORCE injects kicker joints to close this route permanently.

Wall-to-Slab
Junction

Stops
Base Leakage

Pressure
Capable

Verified
Seal

Common Problems

What We Typically Find

The conditions most often reported before a kicker joint injection scope is developed.

01

Water pooling at the base of a wall

Ingress at the kicker line running along the floor.

02

Damp rising in the lower wall

Moisture entering at the joint and wicking upward.

03

Failed surface sealant at the junction

Fillet seals applied over a joint that is under pressure.

04

Corrosion of starter bars

Sustained moisture at the joint attacking reinforcement.

Scope & Application

What This Service Covers

Service Scope

  • Joint identification along the wall base
  • Angled drilling to intersect the kicker joint
  • Packer installation at close spacing
  • PU injection to arrest active flow
  • Acrylic gel to the soil face where needed
  • Packer removal and making-good
  • Cementitious fillet and coating
  • Final inspection and testing

Suitable For

  • Basements
  • Retaining Walls
  • Construction Joints
  • Lift Pits
  • Water Tanks & Reservoirs
  • Swimming Pools
  • Podiums & Underground
  • Tunnels & Utility Ducts

Key Benefits

  • Stops leakage at the wall base
  • Treats the full junction line
  • Protects starter reinforcement
  • Makes the basement usable
  • Internal access only
  • Long-term seal
  • Avoids external excavation
  • Withstands hydrostatic pressure
Our Process

Work Methodology

Five controlled stages from first inspection to final quality check.

Inspection — Kicker Joint Injection
1

Inspection

Identify the kicker line and where water is entering along it.

Drilling — Kicker Joint Injection
2

Drilling

Drill at an angle to intersect the joint between kicker and slab.

Injection — Kicker Joint Injection
3

Injection

Inject PU at close spacing along the joint until flow stops.

Fillet & Coating — Kicker Joint Injection
4

Fillet & Coating

Form a cementitious fillet and coat the junction.

Final Inspection — Kicker Joint Injection
5

Final Inspection

Confirm the joint is dry across its full length.

Materials & Systems

Specified To The Condition

Systems are selected according to substrate, exposure and project specification. The final specification is confirmed after a site assessment.

Hydrophobic PU Resin

Arrests active flow at the joint interface.

Crystalline Cementitious Fillet

Forms a coved, self-sealing secondary barrier at the junction.

Mechanical Packers

Close-spaced to give continuity along the joint.

Gallery

Work In Progress

Kicker Joint Injection — site photograph
View
Kicker Joint Injection — site photograph
View
Kicker Joint Injection — site photograph
View
Kicker Joint Injection — site photograph
View
Full Gallery
FAQs

Questions About Kicker Joint Injection

It is a cold joint right at the bottom of the wall, exactly where water pressure is highest.
Yes. Angled drilling reaches the joint from the wall face, so the slab stays intact.
Rarely. Under pressure a surface fillet will be pushed off, so the joint itself is injected first.